The final aspects for the development required the chartering of a specialist rock dump vessel. The vessel was initially mobilised with 15993Te of 1/8” crushed rock required for pipe line and cable protection between both platforms.

In total, 12410Te of crushed rock was successfully deployed via a centralised moon pool and fall pipe, for protection of the 8” pipe line and high voltage power & communication cable.